We plan to build a plant equipped with the latest innovative technology that can produce the cleanest low cost solar-grade silicon metal. It will be the first high-tech plant in Mongolia.

  • We have 5 million tonnes of high grade quartz resources
  • Project NPV is $1.4 billion (internal estimate)
  • Quartz will be processed into Silicon Metal
  • Initial silicon metal production capacity is 10,000 tonnes per annum and it will
    increase up to 50,000 tonnes.
  • Silicon metal is one of the Critical Raw Materials by the EU, USA and China.
  • Strong and stable growth in driving industries such as the PV, semiconductor, optical fiber and lamp tubing industries.
PROJECT RICHFLUORITE QUARTZ PROJECT
Location
Dalanjargalan soum of Dornogobi province
Capacity
10,000 to 50,000 tonnes
Initial investment required
$73 million USD
Permits and Licenses
2 mining licenses
Technology
PUREVAP process
Report available
Australian expert report