ENERGY PROJECT

TODAY’S CAELUM, TOMORROW’S HERITAGE

ENERGY PROJECT

  • Power Plant with an installed capacity of 600 megawatts
  • Financial model was audited by KPMG
  • Lowest emission levels (Nox – 5 times lower, SOx – 9 times lower, PM – 25 times lower than EU standards)
  • Built with Internationally recognized technology 

MAIN ADVANTAGES TO OFFER:

  • We own 675 million tonnes of thermal coal resources approved by the Government of Mongolia
  • 526 million tonnes of thermal coal resources as per Canadian standard of NI 43-101 report.
  • Will be extended up to 3 gigawatts.
  • All the required permits, licenses and documents are in place.
  • Our “Green Coal – Blue Sky” initiative was introduced to and supported by
    UN Sustainable Development Goals Organization.
  • Greenhouse gas or CO2 from the power plant will be directed to Micro Algae growing farm and algae can further be processed into biofuel, animal feed, antioxidants etc.
PROJECT TSAIDAM ENERGY
Location
Bayan subprovince, Tuv province
Installed capacity
600 megawatts
Investment required
$863 million USD
Permits and Licenses
Power Plant construction permit, and 3 coal mining licenses
Power Purchase Agreement (PPA)
300 megawatts to be sold to the Central Energy Grid of Mongolia
Land permits
150 hectare land certificate, and 200 km land certificates for power transmission line
Water source
Sufficient underground water resource
Technology
Chimneyless Power Plant
ЕРС
CHMC, a Chinese SOE
Project financial model
KPMG
Report available
IMEEI feasibility study, and Canada NI 43-101 report