NEWS

Listing Exchange

MGL Caelum team has signed a Listing Agreement with Capex.MN, a crypto exchange to offer first asset backed CÆL token in Mongolia on 12.12.2021 at 12:12PM.

Listing Exchange

MGL Caelum team has signed a Listing Agreement with Capex.MN, a crypto exchange to offer first asset backed CÆL token in Mongolia on 12.12.2021 at 12:12PM.

Listing Exchange

MGL Caelum team has signed a Listing Agreement with Capex.MN, a crypto exchange to offer first asset backed CÆL token in Mongolia on 12.12.2021 at 12:12PM.

OVERVIEW OVERVIEW

Rapid growth, speed, and continuation of technological advancement are changing the procedures of functionality and maintenance by involving technologies like Blockchain, artificial intelligence, machine learning, progressive mining facilities, and more. With the primary shift, we are adjusting our business structure with recent advanced technology for the efficiency it can bring.

In line with the current state of industry, MGL Caelum Pte. Ltd. & MGL Caelum LLC is establishing the business complex which will be combination of valuable resources and advanced technology. We are planning to implement 6 synergetic group of projects in Mongolia, which are power plants, industrial complex, crypto farm, AI driven data center, smart supply chain and blockchain based commodity trading platform projects.

To develop these six group projects, we aim to fundraise a total of $400 million USD through the IEO. $50 million USD will be raised through the IEO in Mongolia and remaining $350 million USD will be from international market.

PROJECT INTRODUCTION PROJECT

ENERGY PROJECT

• Power Plant with an installed capacity of 600 megawatts
• Financial model was audited by KPMG
• Lowest emission levels (Nox – 5 times lower, SOx – 9 times lower, PM – 25 times lower than EU standards)
• Built with Internationally recognized technology

MAIN ADVANTAGES TO OFFER:

• We own 675 million tonnes of thermal coal resources approved by the Government of Mongolia
• 526 million tonnes of thermal coal resources as per Canadian standard of NI 43-101 report.
• Will be extended up to 3 gigawatts.
• All the required permits, licenses and documents are in place.
• Our “Green Coal – Blue Sky” initiative was introduced to and supported by
UN Sustainable Development Goals Organization.
• Greenhouse gas or CO2 from the power plant will be directed to Micro Algae growing farm and algae can further be processed into biofuel, animal feed, antioxidants etc.

  • Project name Tsaidam Energy
  • Location Bayan subprovince, Tuv province
  • Installed capacity 600 megawatts
  • Investment required $863 million USD
  • Permits and Licenses Power Plant construction permit, and 3 coal mining licenses
  • Power Purchase Agreement (PPA) 300 megawatts to be sold to the Central Energy Grid of Mongolia
  • Land permits 150 hectare land certificate, and 200 km land certificates for power transmission line
  • Water source Sufficient underground water resource
  • Technology Chimneyless Power Plant
  • ЕРС CHMC, a Chinese SOE
  • Project financial model KPMG
  • Report available IMEEI feasibility study, and Canada NI 43-101 report
  • Project name Richfluorite Fluorspar Project
  • Location Darkhan, Norovlin, Bayan Ovoo subprovince of Khentii province and Gobi Ugtaal subprovince of Dundgobi province
  • Capacity 400,000 tonnes of Acidspar 160,000 ton nes of Hydrofluoric Acid 640,000 tonnes of Anhydrite
  • Initial investment required 37 million USD
  • Permits and Licenses 9 fluorspar mining licenses
  • Water source Water research is done in 50 km radius, resource is sufficient
  • Technology Floatation processing
  • Reports available JORC resource statements

FLUORSPAR PROJECT

We will build the largest fluorspar processing plant in Mongolia to process our own deposits and we will become a major supplier in global fluorspar market.

We own 24 million tonnes of fluorspar resources
• Project NPV is $1.7 billion (internal estimates)
• Market price of acidspar is $350-400 per tonne and increasing steadily
• Current hydrofluoric acid price is $1,500 per tonne
• Fluorspar is listed in the list of Critical Raw Materials by EU, USA and China.
• Fluorspar is widely used in production of chemicals, refrigerants, aluminum, steel and high value-added materials in the industrial world.

QUARTZ PROJECT

We plan to build a plant equipped with the latest innovative technology that can produce the cleanest low cost solar-grade silicon metal. It will be the first high-tech plant in Mongolia.

• We have 5 million tonnes of high grade quartz resources
• Project NPV is $1.4 billion (internal estimate)
• Quartz will be processed into Silicon Metal
• Initial silicon metal production capacity is 10,000 tonnes per annum and it will
increase up to 50,000 tonnes.
• Silicon metal is one of the Critical Raw Materials by the EU, USA and China.
• Strong and stable growth in driving industries such as the PV, semiconductor, optical fiber and lamp tubing industries.

  • Project name Richfluorite Quartz Project
  • Location Dalanjargalan soum of Dornogobi province
  • Capacity 10,000 to 50,000 tonnes
  • Initial investment required $73 million USD
  • Permits and Licenses 2 mining licenses
  • Technology PUREVAP process
  • Reports available Australian expert report
  • Project name Eco-Tech Industrial Complex
  • Location Tuv, Dundgobi, and Dornod provinces
  • Capacity 1 graphite & limestone mining license, 2 gypsum mining licenses, 3 semi-coking coal mining licenses, 3 sodium sulfate mining licenses
  • Resources 100 million tonnes of graphite, 300 million tonnes of limestone, 1 million tonnes of gypsum, 170 million tonnes of semi-coking coal, 50 million tonnes of sodium sulfate
  • Production capacity Graphene 50,000 tpa, Nano Precipitated Calcium Carbonate 300,000 tpa, Sodium Sulfate 80,000 tpa, Semi-Coking Coal 450,000 tpa, Soda Ash 500,000 tpa
  • Initial Investment $160 million USD for graphene plant, and $431 million USD for the other plants

OTHER MINERAL PROJECTS

We are working to get our energy, fluorspar and quartz projects listed on Singapore Stock Exchange within 2022. Listing process has been started. After listing foregoing projects, we planned to list our other minerals projects incertain phases of gradual development.

With our own deposits of sodium sulfate, gypsum, limestone, and semi coking coal, we will produce cement, lime, sodium sulfate, soda ash, nano fertilizer, nano precipitated calcium carbonate and semi-coke. All the permits, licenses, statutory documents are in place and approved in Mongolian standards.

These projects are relatively in early stage of development by Mongolian government agencies. However the deposits are ready for mining. While our energy, fluorspar and quartz projects are constructed, all these minerals projects will be documented and reported in compliance with the internationally accepted standards in order to get ready for financing and development. Once the projects are developed, these will worth $2 billion USD.

ADVANCED CRYPTO FARMING

CURRENT SITUATION

China has always been a popular place for crypto farming due to the low electricity cost. Despite China’s recent crackdown on bitcoin exchange and associated mining activity, China was dominating the mining landscape for bitcoin (79% of world). Miners need to move to regulated places with cheap electricity supply.

Mongolia is a good destination to run crypto farming business because of its legal environment, cheaper electricity price and cooler climate.

OUR MAIN ADVANTAGES:

Continuing growth of
Bitcoin price

We will build an advanced crypto farm equipped with 8000 units of Antminer S19 Pro devices.

2113

bitcoin will be mined per annum

15% cheaper electricity than China

40% cost saving opportunity

145% million annual sales

BLOCKCHAIN BASED COMMODITY TRADING PLATFORM

  • – Mongolian Mining Products export value amounts 7039 million USD per annum, which accounts 93% of the total export volume per year. Every Traders needs to pay bank fee and middle traders fee which are 1.5% and 4% respectively, these can be saved with our Trading Platform.
  • – We will build a blockchain-based commodity trading platform which enables us to connect domestic trading to the world, Traders will be able to buy/sell mineral products through the trading platform worldwide.

Advanced to Blockchain & Smart contract

$3.0 Billion trading volume (Only partner’ project sales volume)

$25 million transaction fees (1.5% bank fees)

$451 million cost saving(4% intermediary fees)

BLOCKCHAIN & IOT BASED SMART SUPPLY CHAIN PLATFORM

Blockchain-based commodity trading platform will use our industrial park and its products for the foundation. To effectively operate, this trading platform will require a fully digital supply chain ecosystem that can feed real-time data and track assets in a decentralized blockchain network.

Accessible via easy to use web and mobile user interfaces, and an open API, the Smart Hub brings together supply chain actors, and enable their supply chains to share information, collaborate, conduct data analysis, and validate product traceability in real-time on a trusted platform.

The Smart Hub allows secure sharing and exchange of documents with supply chain partners using blockchain powered version control. Authorized parties to any shipment can immediately see when changes have been made, and by whom, along a shipment journey.

IoT sensors are installed on containers/trucks and transmit data to the Smart Hub dashboard to track valuable shipments, monitor their key physical measurements, and protect high-value products against theft. A client gets positioning data for shipment in real-time, irrespective of the shipping carrier they choose.

Based on the blockchain based trusted network established among the Smart Hub participants, the marketplace ecosystem will enable verification and scoring of stakeholders in supply chain without the need for third-party credentials. Moreover, the marketplace is a blockchain based decentralized ecosystem that enables buying, selling and exchanging of services without the need of intermediaries among the users.

Increased operational efficiency and better fleet management
Better risk analysis and faster trade finance process
Transparency on product traceability and provenance
Increased visibility and accurate planning
Broader market access and stronger customer relationship
Reduced disputes caused by inconsistent and late data sharing

AI, TIER 4 DATA CENTER

Unprecedented growth in mobile internet and data consumption globally over the last few years is accelerating the need for data storage space and capacity.
AI driven TIER 4 data center will be constructed adjacent to our power plant.
  • – Reliable energy source, cooler climate, good geographic location are considered the main advantages of our project.
data_center

TOKEN INTRODUCTION TOKEN

TODAY’S CAELUM, TOMORROW’S HERITAGE

TOKEN TICKER

CAEL

TOKEN SYMBOL

TOKEN ISSUER

MGL Caelum Pte. Ltd & MGL Caelum LLC

TOKEN STANDARD

ERC20 & BEP20

TOTAL TOKEN SUPPLY

999’999’999’999

TOKEN PRICE

0.001 USD

TOKEN STRUCTURE

chart
  • 25%ECOSYSTEM DEVELOPMENT
  • 35%INTERNATIONAL MARKET via IEO
  • 10%BOUNTY, AIRDROP AND BONUS
  • 25%PROJECT TEAM AND ADVISORS
  • 5%MONGOLIAN MARKET via IEO

TOKEN FUND DISTRIBUTION

US$ 114M

token_1
ADVANCED
CRYPTO FARMING

US$ 100M

token_2
GREEN ENERGY POWER PLANT

US$ 100M

token_3
AI TIER 4 DATA CENTER

US$ 46M

token_4
BLOCKCHAIN BASED COMMODITY TRADING PLATFORM

US$ 40M

token_5
ECO-TECH INDUSTRIAL PARK

US$ TBD

token_1
BLOCKCHAIN & IoT BASED SMART SUPPLY CHAIN PLATFORM

TOKEN UTILIZATION

Notice: We created this token which is a crypto voucher, will be used in future as one of the payment option to obtain products, services and Eco-system development fees, with this value of the token will be freely floating subject to the market.

MGLCaelum token value proposition

  • Asset backed
  • Investment to the real projects
  • Token price increases in the short run based on the ecosystem development.
  • Token holder will receive return from project profit.
  • Limited token supply
  • Trading opportunity
  • MGLC token can be used to pay
  • ecosystem fee
    • TOKEN STAKING IS AVAILABLE
    • HERITAGE FOR THE NEXT GENERATION
    • REAL CONTRIBUTION TO MONGOLIA’S DEVELOPMENT
    • INVESTMENT FOR THE BETTER FUTURE
    • GENUINE ASSETS IN YOUR WALLET
    • VALUE CREATION IN YOUR WALLET
    • MANAGING ASSETS, CREATING VALUE IN YOUR WALLET

    TOKEN ADVANTAGES

    – Tokenized ownership and profit sharing of the next-generation Projects
    – Backed by real strategic mineral assets.
    – Some of the projects to be listed on Singapore Stock Exchange (SGX) in 2022
    – Dedicated electricity supply and infrastructure from own sources
    – Relatively cheap electricity tariff in Asia
    – Cool weather condition in the World
    – Blockchain-based commodities trading platform for digital trading of the strategic minerals and mineral products
    – Digital supply chain platform underpinned by Blockchain and IoT for tracking of assets traded
    – Geographical advantage of neighboring to China, the largest crypto mining place in the World

     

     

     

     

    ROADMAPROADMAP

    2021 Q3
    The white paper v1
    2021Q4
    IEO
    2022Q1
    • Start construction of Block 1 for power plant
    • Start fluorspar mining
    • Start construction of fluorspar processing plant
    2022Q2
    • Start construction of quartz mining
    • Start construction of quartz processing plant
    • Start construction of crypto farm with 40 containers
    • Start of crypto farming infrastructure
    • Trading platform development
    2023Q1
    Start construction of block 2-4 of power plan
    • Start coal mining
    • Start construction of hydrofluoric acid plant
    • Commencement of quartz mining
    2023Q2
    • Commencement of 40 containers for crypto farming
    • Trial run with fluorspar processing plant
    2024Q3
    Commence operation of first block of Power Plant
    2024Q4
    Commencement of quartz processing plant
    • Commencement of fluorspar processing plant
    • Start of trading platform
    • Start of supply chain platform
    2025Q3
    Commencement of the other blocks of power plant

    EXECUTIVE TEAM TEAM

    The Executive Team with vast experience in fields like Project developing, project financing, Mining, Information Technology, Infrastructure, EPC and Management. All the members have success stories individual and as a team, they get together here to development one of benchmark project in history of Mongolia.

    ANKHBAYAR KHURLEE
    Executive Chairman & CEO
    PHILIP MOYNAGH
    Board Member & COO
    KOH KWEE NGEE
    Board Member
    TAN KUAN YANG, ANDREW (CHEN GUANGYANG, ANDREW)
    Board Member
    BYAMBASAIKHAN BAYANJARGAL
    Board Member
    ENKHTAIVAN BAYASGALAN
    Board Member & Project Director
    BATBAATAR TSOGTBAYAR
    Board Member
    MUNGUNBAYAR BATBAYAR
    CMO
    KHASCHULUU MUNKHBAYAR
    Project Ambassador and DeFi Director
    GANBAT OCHIRJAV
    CFO
    MANLAI BAT-ORSHIKH
    CTO
    BUYANKHISHIG ISHDORJ
    Director of Investment
    BATTUR KHALTAR
    Director of Business Development
    BATKHUYAG GANBOLD
    Director of Project Infrastructure
    GANBOLD NARMANDAKH
    Mining advisor
    SAYANA TSENDSUREN
    Project manager
    HITESH JAYSHUKHLAL UPADHYAY
    Finance Manager
    BAYARMAGNAI BAYARSAIKHAN
    Government Liaison Manager
    CHINBAYAR BATTUR
    Director of ICT
    MUNKHBAYAR YONDON
    Logistics Manager
    GANZORIG AYUSH
    EPC Manager
    BATNARAN TSABATSHIR
    Supply Chain Manager
    ZOLBAYAR ODONSUREN
    Senior Developer
    ERDEM BATSAIKHAN
    Senior Developer
    ENKHZUL DAGVADORJ,
    Legal Counsel
    BAASANDORJ BAYARAA
    Legal Counsel
    ENKHBAATAR SAMBUU
    Energy Engineer
    SERDARAM DAMDIN
    PhD Sustainable development & Environmental advisor

    Today’s CAELUM

    Tomorrow’s HERITAGE

    PARTNERS PARTNERS

    1
    kpmgpng
    logo3
    logo4
    logo5
    logo10
    logo7
    logo8
    mizorn
    board
    logo11

     Email: info@mglcaelum.com

     Tel: +976 77111416

    Singapore office:

    MGL Caelum Pte. LTD.
    463 Crawford Lane
    #02-09 Crawford Court,
    Singapore 190463

    Mongolia Office:

    MGL Caelum LLC
    Union Building, Block A, Floor 9
    Sun Road 62, UNESCO Street
    Sukhbaatar District,
    Ulaanbaatar, Mongolia

    CONTACT CAELUM CONTACT